Laying Track Through the Mountains

The track base is now complete as far as the intermediate station on the mountain pass line, and slightly beyond, and I have been laying the track and have successfully run trains to and from the station. I had to use flexible track because the fixed-radius curves I have in hand are not small-enough radiusContinue reading “Laying Track Through the Mountains”

Completing some odd jobs!

Over the weekend I completed three tasks which have occupied the back of my mind for many weeks! The big one, which did not actually take very long, was properly mounting the control panel on a permanent bracket in front of the layout: the panel itself needs to be removable for exhibition purposes, and whenContinue reading “Completing some odd jobs!”

Signalling Innsdorf Station

Swiss signalling is very distinctive and I had no idea (a) how it should work or (b) where I could buy the signals (or parts to make them). I searched on the World Wide Web for Swiss railway signalling and found some very comprehensive information, including a very helpful article on Wikipedia which I haveContinue reading “Signalling Innsdorf Station”

The Pre-planning Fact-finding Tour

Before I could do much in the way of planning my Alpine layout I really needed to visit Switzerland specifically to look at its railways. While I had visited a few times, always by rail, I had not really looked at the railways themselves very much with a view to building a model. Although IContinue reading “The Pre-planning Fact-finding Tour”